Detailed explanation: shower room installation process

It seems that no matter what building materials products will refer to the installation, the choice of shower room is no exception. It may also be said that if the shower room is safe or not, it will blew itself up. It also has a close relationship with whether the installation of the product is formal or not: Are the accessories tightly stretched? The use of waterproof seals can affect future use. The intensity and angle of installation are also beyond the control of the average person. It is best to find experienced factory installers to operate.

Step 1: Check that the packaging is intact and ready to use the tools before loading.

Step 2: Assemble the bottom basin part, adjust the level, and connect the hose to the floor drain.

Step 3: Pour the water test to see if the water is fast and unobstructed.

Step 4: Use a pencil and a ruler to find a good position on the wall and start drilling with a hammer drill.

Step 5: Install the aluminum material, knock in the rubber particles at the drilling place, lock the aluminum bar to the wall with screws, and constantly adjust the position to ensure the verticality of the aluminum material.

Step 6: First tighten the glass clamp to the hole in the bottom basin, place the tempered glass in the glass clamp slot, push it into the wall aluminum and fix it with screws.

Step 7: Find the position of the fixing seat, punch it, install the fixing seat, and connect the top tube.

Step 8: The racks in the shower room should be installed at this time, mainly to maintain the vertical and horizontal glass partitions.

Step 9: Install the hinged door. There are hardware mounting holes on the glass. After the equipment is installed, it should be adjusted to tightness and moderate. The switch is most comfortable.

Step 10: Install the rubber strips with water-blocking effect on the sides of the glass and seal the various gaps with silicone.

Step 11: Final commissioning of the entire shower room and each hardware accessory.

Step 12: Install the decorative aluminum bar and clean the interior of the shower.

Shower room hardware glass switch decorative glass door

10m Measuring Tape

10M Measuring Tape,Large Tape Measure,Longest Tape Measure,Black Tape Measure

SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.chaoyuetools.com

Posted on