Sanitary ware installation process

The decorative focus of the bathroom: First, the wall tiles. The second is sanitary ware.

>>> How to buy an old man's sanitary ware?

(I) Construction process

Wall tiles, ceilings, floor tiles, toilets, washbasins and bathtubs, installation and connection of drains, installation of lamps, sockets, mirrors, installation of towel bars and other hardware accessories.

1. The toilet process

Check the ground drain pipe → align the nozzle → flatten the alignment → draw the mark → punch the hole → put the putty → cover the rubber pad → screw on the nut, → mark the two holes on the back of the tank → punch → Insert the bolt → Securely press → Place the back tank with the flat alignment → Screw on the nut → Install the backwater tank elbow → Install the eight-word door → Bend the fork of the maternity lamp → Insert the drift door and the eight-character door → Tighten the nut.

2. Washbasin process

Expansion bolts are inserted → 捻 → → → 盆 盆 盆 盆 盆 盆 挂 挂 挂 把 把 把 把 把 把 把 把 把 把 脸 脸 把 把 把 把 把 把 把 把 把 。 。 。 。 。 。 。 →

3. Bathtub process

Bathtub installation: → Launching → Putty tightly closed → Sheung Shui installation → Trying to find out

4. Shower process

Cold and hot water nozzles are leveled with test tubes → Measure short section dimensions → Installed on the nozzles → Apply brass to the water inlet of the shower and apply the nut → Tighten on the wall → The upper copper tube is installed in the three ports → Wood screws are fixed to the wall.

5. The process of bidet

Hybrid switch, hot and cold water door cover and nut leveling, → water gate installed → nozzle turn core door installed → hot and cold water door outlet nut tightening → hybrid switch nut tightening → install three water door cover → magnetic bowl installation Good → When installing the nozzle → Install the drain → When installing the handlebar → Adjust the positioning.

(b) Construction essentials

1. Wash basin installation construction essentials:

(1) Sink basin products should be flat and lossless. Drain plugs shall have overflow holes of not less than 8mm diameter.

(2) Drain plugs and sinks When connecting, the drain plug overflow hole should be aligned with the overflow hole of the sink basin as much as possible to ensure that the overflow site is unblocked. The top surface of the drain plug should be lower than the bottom of the wash basin after being attached.

(3) Bracket fixing bolts may be galvanized bolts or galvanized metal expansion bolts of not less than 6mm (if the wall is perforated, expansion bolts are strictly prohibited).

(4) After connecting the sink with the drain pipe, it should be solid and dense, and it is easy to disassemble. The joint must not be exposed. The sinks are applied with silicone paste at the wall contact points.

(5) If sink drainage traps and taps are plated products, the coating must not be damaged during installation.

2. Tub installation method:

(1) When the apron tub is installed, the bottom of the apron shall be close to the ground, and a 250-300mm hole shall be reserved in the drainage place of the floor slab to facilitate drainage installation. A manhole shall be provided at the end wall of the bathtub drain.

(2) Other types of bathtubs can determine the height of the tub on the basis of relevant standards or user requirements. Then install the tub after laying two brick bases. For example, the side of the bath tub should be installed with a manhole or a manhole at the drain end wall.

(3) The height of various hot and cold faucets or mixer taps shall be 150mm higher than the upper plane of the bathtub. The chrome plating should not be damaged during installation. Chrome plated cover should be close to the wall.

(4) The height of the fixed shower and hose shower can be installed according to relevant standards or according to user's requirements.

(5) The installation plane of the bathtub must be calibrated with a horizontal ruler and must not be sideways. The joint between the side of the bathtub and the wall is filled with sealant and compacted.

(6) The connection between the tub drain and the drain pipe should be solid and compact, and it is easy to disassemble and the joint must not be exposed.

3. Toilet installation points

(1) The installation angle of the water supply pipe is generally 250mm from the ground to the center of the angle valve. If a one-piece toilet is installed, the height of the water inlet of the toilet shall be determined, but not less than 100mm. The center of the water supply valve is generally in the sewage. 150mm to the left of the center of the tube or to the actual size of the toilet.

(2) The low water tank toilet is applied with galvanized head bolts or galvanized metal expansion bolts. If the wall is a perforated brick, expansion bolts are strictly prohibited. A soft gasket should be used between the tank and the nut. It is forbidden to use a metal hard plate.

(3) The water tank and one-piece toilet shall have a back wall of the tank not more than 20mm away from the wall.

(4) The installation of the toilet shall not be less than 6mm galvanized expansion bolts, and the soft washer shall be fixed between the toilet and the nut. The sewage pipe shall be exposed to the ground 10mm.

(5) The toilet shall be covered with putty around the bottom drain at the time of installation, and then the toilet discharge port should be pressed down towards the sewage pipe and pressed slowly and compactly. The gasket nut should be tightened to remove the squeezed. The putty is cleaned with a putty or a rag immediately after filling with a putty around the base.

(6) The height of the overflow pipe in the flushing tank should be 30~40mm lower than the wrench hole to prevent water overflow from the wrench hole when the inlet valve is damaged.

(III) Precautions

1. Do not damage the waterproof layer. If there is damage or no waterproof layer, waterproof should be done first, and 12 hours of water leakage test.

2. Sanitary ware is firmly fixed and the pipe connections are tight.

3. Pay attention to finished product protection and prevent bumping sanitary ware.

Bathroom faucet switch socket decoration bathroom door bathroom wall tile bathroom door size bathroom size bathroom sink bathroom ceiling bathroom waterproof bathroom floor tile

Led Therapy Bulb

Led therapy bulb with E27/E26 socket, Red Light Infrared works for full body, we have 12w 24w 36w bulb, with 660nm and 850nm wavelength, customized led also ok.

The most convenient red light therapy solution

  • E27 therapy bulb Suitable to use on any part of the body.
  • Anything in the first couple of inches of skin can be affected by this light, making it suitable for; hair health, general skin tone/beauty, acne, eczema, wounds, bruises, sunburn, joint pain, wrinkle prevention, and much more.

Panel Led Lighting




Therapy light, led therapy lamp, light therapy lamp, lamps for light therapy, therapy light lamp

Shenzhen Wenyi Lighting Technology Co., Ltd , https://www.wygrows.com

Posted on