Tips on interior decoration of electrical wiring

Hydropower engineering is generally the first project of renovation. General renovation will involve hydropower reform.

1. The designer gives a hydropower map based on your distribution of water and electricity. Which lamps are clearly marked above, and where the switch is a line, the distribution of lights and sockets. If you haven't asked the designer, then you will mark on the floor plan where you plan to put some electrical appliances. It must be full and comprehensive. In this way, the construction master will help you to prewire the wires according to your usage needs.

2. The water circuit is a hidden project, so it is necessary to slot the wall or the ground, bury it first, and thread it. Find the right place based on your circuit. The formal embedding line must be at a corner and turn right at the corner. However, such fees may be higher. Generally, they are charged according to the length of the renovation. So how can someone be so short?

3, The main power switch is your home's main switch, you can give your family a blackout after pulling it out. The source of all buried lines is this master switch.

4, a group is a line tube terminal, such as a group behind the bathroom door, including a light switch, a ventilation fan switch, a socket. One is referring to one of them. Generally speaking, it is a socket.

5, when the split line is generally better separated by strong and weak electricity, strong electricity refers to the socket, weak refers to the network cable, communications lines, and so on. (General situation) point water heaters and other air conditioning and other electrical power overload switch is not necessary, but the safety factor is higher, and some communities are mandatory installation, management office to be accepted.

6, how many flat line anywhere, this should be based on your degree of transformation, I said above, generally in accordance with the length of your wiring charges, a 60 square meters of two rooms, the normal change is about 3,000 or so. Calculate based on your area. In order to ensure safety, this part of the project recommends the use of good materials, because the changes will be wall-planing, try not to go wrong.

7, as much as possible to stay some lines, such as audio lines, network lines, etc., in order to prevent unexpected use. By the way, if the northerners pay attention to the distance between the wires and the geothermal heat. The same is true for waterways. We must ensure quality.

I am a designer, not a professional electrician. I have no questions. I can ask the electrician who gave you the decoration. It will be worthwhile to guarantee the quality of the package. Also, when the wall must pay attention to the protection of the original line, to ask the developer to the original circuit, after laying a good line, be sure to save the new circuit layout, convenient for future maintenance.

Entrance decoration children's room decoration switch socket decoration design electrical layout

Accessories

Jinwu Glass Fiber Co., Ltd , https://www.jwglassfiber.com

Posted on