Domestic stone machinery and equipment assembly technology and precautions

China's stone machinery and equipment assembly according to the different types of equipment, the corresponding assembly process and requirements are not the same, therefore, mechanical equipment manufacturers must ensure the quality of the assembly of stone machinery products, must comply with the provisions of various stone machinery products assembly technology Request to operate.

According to the equipment flow of common types of mechanical equipment, we have summarized the following precautions.

1. Do a good job in cleaning and cleaning parts. The cleaning work includes the removal of residual foundry sand, rust, chips and the like. In particular, some important parts, such as the gantry cutting machine, the inner cavity should be coated with anti-rust paint. Oil, rust or attached chips on the parts can be cleaned with diesel, kerosene or gasoline as washing liquid and then blown dry with compressed air.

2. The matching surface is generally required to be lubricated before it is fitted or connected. In particular, the bearing part in the headstock part, the screw nut part of the lifting mechanism.

3. The matching size of the matching parts should be accurate, and the matching size should be re-examined or sampled during assembly. For example: the journal of the main shaft and the bearing joint, the hole of the headstock and the bearing and its center distance.

4. The assembly of the wheel requires that the axial lines of the two toothed wheels must be in the same plane and parallel to each other, and the normal tooth gap should be ensured, and the axial misalignment is ≤ 2MM.

5. The joint surface of the joint should be checked for flatness and deformation. Otherwise, the burr should be removed to ensure that the joint surface is tight, flat and not skewed.

6. The sealing member should be pressed into the sealing groove in parallel, which can not be twisted and deformed, and the sealing surface is damaged and damaged.

7. The assembly requirement of the pulley is that the axes of the two pulleys must be parallel, the center of the wheel groove should be positive, and the offset is too large to make the tension of the pulley uneven, resulting in belt slippage and accelerated wear. At the same time, the V-belt should be matched before assembly, and the length should be consistent to prevent vibration in the transmission.

8. Before the bearing is assembled, it should be cleaned and washed after removing the anti-rust paint; when cleaning, pay attention to check whether the raceway and the rolling element are rusted, and whether the rotation is flexible; when the bearing is assembled, a layer of lubricating oil should be applied on the surface of the fitting. If the pressure difference is too large, the assembly should be stopped for inspection; when the bearing is assembled, the end of the model should be facing inward and in the direction of the shoulder; when the bearing is assembled, the magnitude, direction and position of the force should be appropriate and should not be used for the raceway. When the rolling element is stressed, it should be evenly and symmetrically tapped, and it should not be slammed to ensure that the end face is perpendicular to the axis to prevent the installation from tilting.

9, threaded connection should use anti-loose device, according to the actual situation and design requirements to use the following common anti-loose device; double nut anti-loose; spring washer anti-loose; open pin anti-loose; stop washer anti-loose nut and flower pad anti-loose Symmetrical multiple bolt tightening methods should be gradually tightened in a symmetrical sequence, and the strip connectors should be gradually and symmetrically tightened from the center to the two directions. The end of the bolted rib should protrude from the nut.

10. Do the inspection while assembling.

11. Do a good job in pre-inspection work before driving. For example: checking the integrity of the assembly work, the accuracy and reliability of the joints, the flexibility of moving parts, the normality of the lubrication system, etc.

12. Do a good job of monitoring the startup process. Immediately after the machine is started, observe the main operating parameters and whether the moving parts are moving normally. The main operating parameters include the speed of motion, the smoothness of motion, the rotation of the main shaft, the pressure of the lubricating oil, temperature, vibration and noise. Only when the sports indicators in the starting phase are normal and stable can the test run.

13. Conduct trial operation according to the acceptance conditions of various stone machinery products and test related items. For example: adjustment and test of the cutting speed and stroke, adjustment of the lifting movement stroke, and testing of the spindle rotation accuracy.

LED Lawn Light

Our led lawn light include garden spotlight led lawn light, Garden Spot Light led lawn light, spike light led lawn light. Led Lawn Light Garden Landscape Outdoor Lamp Pathway Spike Spotlight. Led Lawn Light Garden Landscape Park Outdoor Garden Path Lighting Lamp Pathway Spike Waterproof Led Garden Spot Light. Jiangmen Synno Co., Ltd is a high and new-tech enterprise. Our company specialized in LED green light source. And we are engaged in medium and high-end LED decorative lighting with a whole set of design and manufacture of lamps and lanterns, development of control system and engineering supporting service. Our company is devoted to provide customers with LED application products. Synno has got through ISO9001 quality system certification of SGS of Switzerland, CE certification of European Union, GS certification, ROHS certification and relevant domestic LED lamps and lanterns certification.

Garden Led Lawn Light, Garden Spotlight Led Lawn Light, Led Lawn Light Spotlight, Led Lawn Lamp, Garden Light Lawn Lamp

Jiangmen Synno Lighting Co., Ltd. , https://www.synnoled.com

Posted on