We all have more or less such a habit. When the CD1 type electric hoist is installed, it has missed some subsequent inspections, resulting in unnecessary losses and hidden dangers. After the installation of the CD1 type electric hoist, some columns are installed. The inspection procedure is as follows:
1. Check whether all the lubrication parts are filled with grease.
2. Is the position of the single beam track installed reasonable?
3, whether the voltage at the installation site matches the standard voltage.
4. Check if there is any loosening or tying of the wire rope, and adjust it if necessary.
5. Start the lifting and running mechanism with the rated load to see if the operation is normal, check whether the sliding distance meets the requirements and whether the reducer has oil leakage.
1. Check whether all the lubrication parts are filled with grease.
2. Is the position of the single beam track installed reasonable?
3, whether the voltage at the installation site matches the standard voltage.
4. Check if there is any loosening or tying of the wire rope, and adjust it if necessary.
5. Start the lifting and running mechanism with the rated load to see if the operation is normal, check whether the sliding distance meets the requirements and whether the reducer has oil leakage.
LED Indoor Stripe lights,Indoor Strip Lights,Office Ceiling Lights,Mall Ceiling Lights
Sichuan Kangruntengpu Photoelectric Technology Co., Ltd. , https://www.krtoplighting.com