Leaking houses is one of the problems that arises among residents in the community and is also one of the causes of headaches for property and neighbors. The leakage of housing is really prevent people from being inadvertently prevented. What is the cause of leakage? In fact, the reason for the leakage is that waterproof is not done well. This article will explain to you how waterproof is checked!
1, before the renovation to carefully check the upstairs floor of the kitchen and toilet whether there is leakage, if there is, you should first do a good job after the renovation of the waterproof project upstairs. If there is no accommodation for the time being or there is no other reason, the waterproof project on the upper floor can not be handled for a moment, then measures should be taken to remedy the problem: Apply polyurethane at the bottom of the leakage site, but the plaster layer of the leakage site should be disposed of. The grassroots should be dry.
2, when the kitchen bathroom decoration, if the original wall tiles destroyed and re-decorated, regardless of whether the original waterproof layer, before re-posted tiles should be re-made waterproof layer, around the side wall waterproof layer is 200mm high, with bathtub Location, waterproof layer exceeds bath top 200mm. When there is a Shower and there is no other waterproofing measure, the waterproof layer should be showered so that it can spray to all parts.
3. Water repellent treatment for kitchen and bathroom decoration: If the original waterproof layer was not used, waterproof layer shall be added according to the above method. If the original waterproof layer is used, it shall be checked carefully to see if the waterproof layer is in place and damaged. Otherwise, it shall be repaired. After the repair, the water injection test should be conducted to ensure that there is no leakage and no humidity in the downstairs and surrounding walls.
(4) After the renovation and completion of the multi-water and wet parts of the kitchen and bathroom, the elevation of the ground should be lower than the elevation of the hall or the corridor ground. The kitchen and bathroom doors should be installed with stones that are not afraid of water. Waterproof treatment should be done at the roots to prevent seepage of stagnant water from the door opening to the room.
5. Special attention should be paid to the barrier between the bathroom and the walkway. Before installing the marble door, all need to be filled with cement to be filled, and then the gate door can be placed after the flat roof. This will effectively block the toilet and the kitchen's running water and effectively seal the water and prevent leaks. .
Waterproof and leakproof construction has a great influence on the entire home improvement. If it is not done well at this point, then it will cause some unnecessary trouble for future life. Therefore, waterproof and leakproof work must be done during the renovation. Oh!
6. If it is a first-floor house, all floors and walls should be treated with water and moisture. In addition, waterproof grooves in the wall should be waterproof. If the original drainage and sewer pipes or floor drains are changed during the renovation, they must be reinforced in the surrounding area.
7, the most easily overlooked waterproof area is the balcony. Exposed balconies must be waterproofed due to exposure to the external environment, so that rain, snow, and other environmental water can be prevented from seeping downstairs. Even if it is a non-exposed balcony, since most users will use the balcony as a place to wash clothes, waterproofing is usually required. In addition, after the renovation, when the pipelines and floor drains cross the floor, the waterproof layer around the holes must be carefully constructed.
Household Waterproof Consumers Should Be Brave in Protecting Their Rights
In July of this year, owner Li of Dawukou invited Zhang, the decoration construction team, to decorate his new house. During this period, Zhang did not leak water to the bathroom of the house. To this end, the owner Lee will refuse to pay the remaining decoration of 1900 yuan. On July 24th, Zhang repeatedly asked for the unsuccessful decoration of the remaining funds, and he forcibly moved Lee’s home items, causing both parties to cause disputes and disputes. After Chaoyang Street police station mediation, the two parties reached an agreement: the construction staff will continue to complete the bathroom's waterproof decoration for the owner. After the project is completed and accepted, the owner will pay the remaining decoration money as agreed.
Hydropower installation hydropower acceptance hydropower reform
Heshan Janno Kitchen and Bath Technology Co.,Ltd , https://www.janno-ks.com