Home improvement mobilization: renovation is a laborious effort, the decoration is slimming suede. Renovation is the challenge of the body limit, decoration is to test the psychological endurance... Let's take a look at the home improvement process before the renovation:

First, understand the comparison and choose the decoration company

Arrange the idea: coordinate the ideas and opinions of the family members, look at the materials and cases, and initially determine the style.

Budgeting: According to the family's financial situation, the renovation budget is initially determined and wealth is made. Determine the upper limit of the foreseeable basic project such as decoration and main materials and strictly enforce it.

Tip: The final budget is 10% above the budget is normal, more than 30% is not fresh!

Choice: The most clear package, the most unreliable for the contractor, or the main material to buy, the other let the decoration company get it!

Choose three ways for the company for reference: a entrust the supervision company to bid; b directly to the home improvement market to find a home improvement company; c find a good home improvement company on the Internet

prompt:

It is common practice to find a home improvement company directly in the home improvement market. It can directly compare the capabilities of home improvement companies and designers. The form of bidding for the supervision company has not been generally recognized by the market. The reputation of the supervision company is one aspect, and the second bidding company is mostly a public decoration company. Involved in the home improvement market, there is still a gap between brand appeal and some home improvement companies. Regardless of which of the above options is recommended, it is recommended that you do not choose a street decoration team, otherwise there will be endless troubles.

Second, negotiate and finalize the decoration plan

The design plan provides requirements, draws sketches, comprehensive communication, field measurements, provides construction and renderings, and provides a renovation budget.

prompt:

1. Most home improvement companies do not charge design fees separately, but the design will follow some rules and form routines.

2, some companies have fee-based designers, if you want to publicize your personality and ample money, you can ask them to design separately, not only because these designers are generally senior design, but also for your home improvement to supervise and guide. The general charge is 2000-3000 yuan, which is still worth the money.

Third, sign the renovation contract

Sign the contract to determine the decoration plan and materials, determine the project budget, determine the construction period, and sign the contract.

prompt:

1. The budget provided by the home improvement company at this time is only the foreseeable project budget, and the structure demolition, pipe wiring, gypsum ceiling, lamp installation, etc. are all calculated according to the actual measurement after the completion of the project. Remember!

2, beware of home improvement company to report false reports in the budget, it is recommended that the project budget should not be confirmed on the spot, it is best to self-measurement recalculation audit.

3. Read the contract carefully. If the responsibility for the article is unclear, it should be required to explain or sign a supplementary agreement on the spot.

4. The contract signed by the relevant state departments shall be standardized and validated by the relevant market, and shall be determined to be legal and valid by the market identification or seal.

Fourth, construction, please or personally supervise

ready

1. Detecting the living room – the flatness of the wall, floor and roof and the water supply and drainage pipes.

2. Check the electricity and gas flow, and make a record

3. Material preparation.

4. Staff scheduling. Identify the construction personnel and identify the person in charge of the construction site.

5. Workshop and site stakeout. Display construction drawings and construction requirements.

Construction company's construction process

1. Demolition of the project: If it is structural, it must be completed. Handling: Demolition of garbage and waste materials. Cleaning: Do the cleaning of the construction site.

2. Hydropower coal project

A. The discharge of hot and cold water pipes and the installation of water supply equipment.

B. Discharge the power supply, electrical appliances, telecommunications, and lighting lines, determine the location of the cassette, and locate and install the cable box switch socket.

C. Emissions installation of gas pipelines and gas appliances.

3. Masonry Engineering A. Bricklaying, partition wall, door and window B. Painting C. Drying rack installation.

4. Metal Engineering A. Aluminum alloy doors and windows, plastic steel doors and windows installation. B. Anti-theft doors and windows, canopy installation. C. Drying rack installation.

5. Woodworking Engineering A. Production of wood products: door and window covers, siding, corner lines, ceiling partitions, kitchen utensils, entrances, etc.

B. Soft sleeper furniture (closet, bookcase, TV cabinet, shoe box, etc.).

C. Laying the floor and skirting board (board). D. Inlay fitting of glass products.

6. Finishing works, paste wall, top paper (cloth), soft decoration.

7. Paint Engineering A. Approved wall, top putty, paint. B. Wood products are embedded with putty. paint. C. Floor, baseboard (board) paint. D. Wall top flour brush latex paint.

8. Installation engineering

A. Electrical switch, socket panel installation, lamp installation.

B. Door locks, doorbells.

C. Sanitary ware three-piece set and hardware accessories (faucet, soap jar, towel rack, paper box, bathtub armrest, mirror glass)

D. Fume removal device, water heater, exhaust fan.

prompt:

1. The project is different at each stage. The key point is to confirm the on-site supervision of materials, key parts, and on-site inspection and acceptance.

2, strictly control the progress of the project, choose to purchase the main and auxiliary materials in advance, to avoid delays in the construction period.

3, gas, plastic steel, flooring and other projects that require the construction of the factory should be coordinated with the renovation team in advance, determine the details of the plan, to avoid problems and push each other.

5. Special person or personal acceptance and renovation

Space experience and renovation

1. Clear the field, the decorated rooms are cleaned up by room by item.

2. Acceptance according to the acceptance criteria (if rectification is required, then inspection).

3. Provide pipeline circuit diagram and warranty card for equipment products.

4. According to the actual amount of decoration works, the total settlement will be issued.

5. Issued to the decoration engineering reputation engineering warranty card.

prompt:

Don't just look at the big face, the corners and corners are the key, especially the various corners and different material intersections. If the problem is found at this time, it can be solved immediately, otherwise it will only wait for after-sales service.

Sixth, the fee settlement

prompt:

1. Carefully review the various expenses calculated according to the actual measurement, and review all the expenses according to the budget table to avoid double counting. The fee paid to the decoration company is paid according to the contract.

2, we must consider the issue of the warranty period. Pay most of the decoration first. It is best to settle all fees after the warranty period has passed.

Seven, warranty, pay the fee

After the renovation, the warranty and the decoration company will settle the full cost.

Solar LED Garden Light

Solar Led Garden Light,Solar Lamp For Garden,Solar Lamp For Landscape,Solar Lamp For Yard

Shenzhen You&My Electronic Technology Co., Ltd , https://www.youmysolarlight.com

Posted on